Skip to main content

Update: Golden thread, gateways, safety case & KBI on every plan — User manual

Built for BSA 2022 · SI 2023/907 · Occupied phase

Safety case report software for Accountable Persons

Structured safety case sections, attestation of all 10 risk management principles, reg.10 engagement linkage, material-change alerts, and BSR submit readiness — alongside golden thread, 16 KBI categories, and resident duties in one occupied portal.

10 principles with individual attestationEngagement linkage before publishStatutory floor on every plan
Safety case
Threadsovereign occupied-phase safety case

Why spreadsheets fail the safety case

  • No structured attestation of each risk management principle
  • Engagement evidence disconnected from the published case
  • Material changes not linked to registration notifications
  • No validators before BSR portal submission day
  • Safety case divorced from KBI and occurrence records

How Threadsovereign supports the safety case

  • Living safety case in the occupied AP/BSM portal
  • Reg.10 engagement point required before publish
  • Material-change alerts with 14-day BSR deadline tracking
  • Evidence packs for BSR visits and counsel review
  • Same platform as Gateway 1, Gateway 2, and Gateway 3 design records

Safety case capabilities built for SI 2023/907

From first draft through BSR submission readiness — not a document store with a checklist bolted on.

10 risk management principles

Structured safety case sections with individual attestation of every principle under SI 2023/907 reg.4 — not a single PDF upload.

Engagement linkage before publish

Publish requires a linked resident-communication engagement point (reg.10) so the safety case reflects demonstrated engagement activity.

Material-change revision alerts

Flags when building information changes materially and tracks 14-day BSR registration notification deadlines.

BSR submit readiness

Validators and checklist status show what is incomplete before you file through the official BSR portal.

Living record alongside golden thread

Maintain the safety case in the same occupied-phase workspace as KBI, occurrences, FRA, and resident engagement evidence.

Multi-HRB portfolios

Explicit building selector and portfolio readiness views for landlords and managing agents with several HRBs.

Safety case questions

Ready to manage your safety case in one system?

10 principles, engagement linkage, KBI, and BSR readiness — statutory occupied workflows on every paid plan.